ANGI International Facility – Shown Prior to 2002 Renovation)

ANGI International has moved to a larger, completely renovated manufacturing facility in Milton, Wisconsin. The complex was built out specifically for ANGI occupancy through substantial investment by ANGI, the property owners and with aid made available by the State of Wisconsin Brownfield Grant Program. The facility is located only 2 miles from the former location.

The new facility expands ANGI’s manufacturing capacity by an estimated 40% and resulted in a much improved work environment for all departments and staff. The new facility offers ANGI 60,000 square feet of manufacturing and material handling floor space with dedicated shop areas for dispenser and panel assembly, compressor assembly, weld and fabrication, machining, control panel assembly and hydrostatic testing. The compressor assembly area is served by two, five-ton bridge cranes, two paint booths and is adjacent to an improved compressor testing facility. The testing facility is set-up with 800 amps of dedicated testing power, a high-flow re-circulation loop that includes, 30,000 feet of high pressure storage, a regulator manifold, load regulators, flow metering and fluid heating. This new testing facility will support extended testing of the largest compressors ANGI packages on natural gas at the customer’s specified suction and discharge conditions. Scheduled expansions to the testing facility include the addition of high power digital drives to provide up to 500kW of programmable electric power and a nitrogen compression loop for functional dispenser testing and leak testing.

Effective November 1, 2002 ANGI’s address is 15 Plumb Street, Milton WI, 53563. All other contact information remains unchanged.

 

 
 
 
Email Us